Quality

Quality that is proven before dispatch.

Every machine is validated against cycle time, weld quality and safety criteria during in-house FAT.

Inspection stages

Four gates every build passes 

Design review

Fixture and reach study reviewed against the part drawing and tolerance stack before cutting steel.

Process trials

Weld parameters proven on customer samples; penetration and distortion checked and recorded.

Factory acceptance

Full FAT at our works with the customer present: cycle time, repeatability and safety interlocks.

Commissioning sign-off

Installation, operator training and buy-off at the plant, then support through the ramp-up.

Delivery protocol

From requirement to support 

  1. 1

    Requirement Study

    Cycle time, part geometry and quality targets captured on the shop floor.

  2. 2

    Concept & Design

    3D simulation, fixture design and reach studies before a single part is cut.

  3. 3

    Manufacturing

    In-house fabrication, machining and panel building of the cell.

  4. 4

    Integration

    Robot programming, PLC/HMI logic, safety interlocks and vision.

  5. 5

    FAT & Quality

    Factory acceptance test with production parts and weld inspection.

  6. 6

    Commissioning & Support

    Installation, operator training and lifetime service support.

Certification

Standards and registrations 

MSME Registered Enterprise

Government of India · 2014

Registered micro, small and medium enterprise engaged in industrial automation.

GST Registered

Government of India · 2017

Registered supplier of industrial machinery and automation systems.

Robot Integration Training

Robot OEM Partner · 2019

Certified programming and integration training on industrial welding robots.

Export Delivery Record

International Projects · 2023

Automation systems designed, tested at FAT and exported to overseas customers.